Licensed Setup Contractor · Since 2007
Turnkey mobile home setup,built storm‑tough.
The same crews that deployed after Harvey, Florence, Helene and more will set your home: blocked, leveled, anchored and inspection-ready. One licensed team from quote to keys.
Free quotes · Reply within 1 business day

- Licensed & insuredWe do the work ourselves
- 19 years in the fieldDisaster-tested since 2007
- Code & manual-spec setsInspection-ready every time
- One team, quote to keysNo hand-offs, no runaround
Setting homes for
- Homeowners
- Dealers & retailers
- Land developers
- Communities & parks
- Investors
- Recovery programs
- Crews in the field since
- 2007
- Deployments & programs
- 22
- Named storms answered
- 11
- State rebuild programs (NC · FL · AL)
- 3
Why the setup matters
A bad set costs more than a good one.
A home is only as solid as what's under it. Most problems we're called to fix trace back to a rushed setup.
Failed inspections
Wrong pier spacing, missing anchors or no paperwork means a re-inspection and another week of waiting.
Delays that stack up
A crew that no-shows or runs short on material pushes back utilities, trim-out and your move-in date.
Unlevel, leaky homes
Sticking doors, cracked drywall and a leaky marriage line show up months later, on your dime.
How Shark sets it right
- Every home is set by our own licensed crews to the manufacturer's installation manual and your local code: every pier, every anchor.
- We check the site before the home moves, so the pad, access and materials are ready on day one.
- Laser-leveled blocking, then a re-check after the marriage line is sealed.
- Photo documentation of piers and tie-downs and a punch-list walkthrough, so the inspector sees the work.
Proven when it counts
When the storms hit, Shark shows up.
Since 2007 our CEO, crews and subcontractors have deployed after the worst the coast can throw: hauling, installing and rebuilding housing for families and communities. That's the crew setting your home.
Disaster relief & recovery
Emergency housing deployments after hurricanes and floods across the Gulf and East Coast.
Haul & install programs
Large state and federal programs to transport, set and deactivate manufactured housing and RVs.
Rebuild programs
Rebuild NC, FL and AL, plus Renew NC: restoring and replacing homes for families recovering from storms.
2007–2017
- Dean (2007)
- Great Flood of Louisiana (2016)
- Matthew (2016)
- Irma (2017)
- Harvey (2017)
2018–2021
- Michael (2018)
- Florence (2018)
- Barry (2019)
- Laura (2020)
- FEMA MVU COVID Vaccination Units, ME & NC (2021)
- Ida (2021)
2022–2023
- JBMDL Operation Allied Refuge (2022)
- NC Mobile Housing Project (2022)
- Inspired Communities (2022)
- NC Haul & Installation (2022–2023)
2023–Today
- Rebuild NC (2023–2024)
- Rebuild FL (2023, 2024–2025)
- Rebuild AL (2023–2024)
- FL Transforming 368 (2024–2025)
- Helene (2024)
- Milton (2024)
- Renew NC (2025–2026)
Before Shark: our team's experience
Before founding Shark in 2007, members of our team were already deploying after major storms.
- Floyd (1999)
- Michelle (2001)
- Ivan (2004)
- Charley (2004)
- Frances (2004)
- Rita (2005)
- Wilma (2005)
- Katrina (2005)
Services
Everything it takes to set a home right.
Single-wides to triples, one home or a whole program. Our licensed crews handle the work start to finish.
Single & multi-section setup
Single-wides, double-wides and triples set to the manufacturer's manual and local code.
Blocking & leveling
Laser-leveled blocking with proper pier spacing so the home stays square for decades.
Piers, anchors & tie-downs
Piers, ground anchors and straps rated for your soil and wind zone. Coastal-tough.
Marriage line & trim-out
Halves joined, fastened and sealed (roof, floor and walls), then trimmed out inside and out.
Skirting
Vinyl, brick or block skirting with proper ventilation, installed clean and straight.
Steps, decks & landings
Code-compliant steps, landings and decks so the home is ready to walk into.
Relocation & deactivation
Mobile home and travel-trailer relocation, deactivation and demolition when it's time to move.
Disaster & program work
Temporary housing, haul-and-install and rebuild programs for agencies and recovery partners.
How it works
From quote to keys in five steps.
Step 1: Request a quote
Tell us about the home and the site. We reply within one business day.
Step 2: Site check
We confirm the pad, access and permit needs with you before the home ships.
Step 3: Set & level
Our crew places, blocks, levels and anchors the home. Multi-sections are married and sealed.
Step 4: Finish work
Skirting, steps, decks and trim-out, with utilities coordinated to keep the schedule tight.
Step 5: Final walkthrough
We walk it with you, close the punch list and hand over photos for the inspector.
Our work
Fresh off the job site.
Recent setups by Shark crews, from first piers to turnkey finish.

Turnkey: skirted, stepped & graveled 
Turnkey doublewide, ready for move-in 
Turnkey finish with landscaping 
Skirting, steps & gravel walkway 
Crew on site: utilities going in 
New steps & landing 
Doublewide newly set 
Set level on block piers 
Set on a freshly cleared lot 
Set on a freshly graded lot 
Piers & vapor barrier going in 
Set on a sandy coastal lot 
Piers & tie-down straps 
High piers on a sloped lot 
Block piers over vapor barrier 
Set & leveled on block piers
The Shark promise
We stand behind every set.
Licensed & insured
We're the licensed setup contractor, not a middleman. License and insurance certificates available on request.
Inspection-ready
Every set follows code and the manufacturer's manual. If the inspector flags our work, we fix it at no charge.
Workmanship guarantee
If something in our installation isn't right, we come back out and make it right.
Service area
Home base on the Grand Strand.
Headquartered in North Myrtle Beach, SC, we set homes across six states, from Virginia down to Florida and west to Tennessee. Not sure if you're in range? Ask.
- Virginia
- North Carolina
- South CarolinaHeadquarters
- Georgia
- Florida
- Tennessee
Headquarters
730 Main St #275North Myrtle Beach, SC 29582
FAQ
Straight answers.
How much does a mobile home setup cost?
It depends on the number of sections, site conditions, distance and what's included (skirting, steps, trim-out). We quote a flat price once we know the home and the site. Send the details and you'll get a real number, not a range.
How long does a setup take?
A typical single-section set takes 1–2 days. Multi-sections usually take 2–4 days depending on the marriage line, weather and finish work. Your quote comes with a schedule.
Are you licensed and insured?
Yes. Shark Management Group is a licensed manufactured-home setup contractor and our own crews do the work. Ask and we'll send license and insurance details with your quote.
Do you handle permits and inspections?
We set to code and the manufacturer's installation manual, document the work with photos and work directly with your inspector. Permit requirements vary by county, so we'll tell you what's needed for your site.
What's included in a standard setup?
Placement, blocking and leveling, piers, anchors and tie-downs, and (for multi-sections) the marriage line. Skirting, steps and decks, trim-out and utility hookups can be added. Your quote spells out exactly what's in.
Do you work with dealers, developers and agencies?
Yes. From single homes to large state and federal programs, we've hauled, set and rebuilt housing at scale since 2007, with scheduling built around your delivery dates.
Can you fix a home someone else set?
Often, yes. We re-level, re-anchor and repair marriage lines. Add photos to your quote request and we'll tell you what we see.
Where do you work?
Virginia, North Carolina, South Carolina, Georgia, Florida and Tennessee. For larger multi-home and program work we can travel farther; travel may be added to the quote.
Free setup quote